CoastalPort Engineering provides complete EPCM solutions for dredging. As the representative in Brazil of Canlemar, a Spanish company with over 30 years of experience in the international market, CoastalPort makes innovative equipment and resources available for the efficient and economical execution of marine works.

01

Execution of dredging and rock removal works

  • Representative of Canlemar in Brazil
  • Spanish company with over 30 years of experience
  • Hydraulic and mechanical dredging
  • Rock placement and rock removal
  • Beach nourishment and hydraulic fill
02

Works supervision

  • Assessment of execution plans and methods
  • Monitoring of dredged volumes
  • Analysis of claims and standby requirements
  • Performance and schedule supervision
  • Legal compliance analyses
03

Dredging monitoring

  • Assessment of environmental aspects of execution
  • Adaptive dredging management
  • Analysis of turbidity and water quality data
  • Environmental compliance analysis
04

Dredger sensor data analysis

  • Compliance with IBAMA technical opinion 29/2017 COMAR/CGMAC/DILIC
  • Analysis of dredger sensor monitoring data
  • Analysis of dredging and disposal locations
  • Analysis of overflow, overboard and jetting
  • Verification of compliance with environmental licence requirements
05

Specialized technical consultancy

  • Analysis and review of designs and execution methodology
  • Management support in planning the procurement of works
  • Assessment of contractual requirements for dredging and supervision
  • Support in handling unforeseen events
Canlemar

Canlemar fleet

Ardenza

Ardenza

Year built
1980 (refitted in 2015)
Type
Mechanical dredger (clamshell)
Hopper
700 m³
Length × beam
52.5 m × 10.0 m
Maximum draught
3.21 m
Dredging depth
50 m
Grab capacity
3.5 m³
Omvac Cinco

Omvac Cinco

Year built
1983
Type
Mechanical dredger (clamshell)
Hopper
500 m³
Length × beam
55.0 m × 9.1 m
Maximum draught
3.42 m
Dredging depth
50 m
Grab capacity
4 m³
Omvac Siete

Omvac Siete

Year built
1978
Type
Mechanical dredger (clamshell)
Hopper
600 m³
Length × beam
58.3 m × 9.5 m
Maximum draught
1.93 m
Dredging depth
50 m
Grab capacity
3.5 m³
Omvac Ocho

Omvac Ocho

Year built
2008
Type
Hydraulic (TSHD) and mechanical (clamshell) dredger
Hopper
512 m³
Length × beam
52.3 m × 9.0 m
Maximum draught
2.60 m
Dredging depth
25 m (hydraulic) / 50 m (mechanical)
Grab capacity
3.5 m³
Omvac Diez

Omvac Diez

Year built
2011
Type
Hydraulic (TSHD) and mechanical (clamshell) dredger
Hopper
1,200 m³
Length × beam
72.7 m × 12.9 m
Maximum draught
3.36 m
Dredging depth
30 m (hydraulic) / 60 m (mechanical)
Grab capacity
6 m³
Pumping distance
800 m
Omvac Doce

Omvac Doce

Year built
2014
Type
Mechanical dredger (clamshell)
Hopper
958 m³
Length × beam
61.3 m × 12.5 m
Maximum draught
3.74 m
Dredging depth
60 m
Grab capacity
7 m³
Omvac Catorce

Omvac Catorce

Year built
2022
Type
Hydraulic (TSHD) and mechanical (clamshell) dredger
Hopper
1,180 m³
Length × beam
63.7 m × 12.5 m
Maximum draught
4.25 m
Dredging depth
30 m (hydraulic) / 60 m (mechanical)
Grab capacity
7.5 m³
Canlemar

Canlemar works in Latin America

2013–2015

Port of Açu (Brazil)

  • Dredging and disposal of 250,720 m³
  • Placement of breakwater foundations – 1,652,890 t
  • Filling of 88 concrete caissons
  • Removal of the temporary breakwater
2015

Port of Pecém (Brazil)

  • Dredging of 591,000 m³ and fill for the quay expansion
2017

Port of Imbetiba – Macaé (Brazil)

  • Hydraulic and mechanical dredging of 405,620 m³ of mud, sand and consolidated material
2017

Port of Mar del Plata (Argentina)

  • Hydraulic and mechanical dredging of 400,000 m³
2013–2015

Port of Callao (Peru)

  • Mechanical dredging of 360,000 m³
  • Rock placement for slope reinforcement
  • Placement of breakwater foundation
2013–2014

Chilota Bay (Chile)

  • Suction dredging of 50,300 m³ of sand and gravel
2012

Valparaíso (Chile)

  • Hydraulic dredging and fill of 231,663 m³
  • Mechanical dredging of 68,000 m³
  • Placement of 23,600 m³ of 500 kg rock
2012

Port of Chaitén (Chile)

  • Mechanical dredging of 50,000 m³ of sand and mud
2012

Puerto Coronel (Chile)

  • Mechanical dredging of 13,000 m³
Experience

Related projects

Studies for the rehabilitation of inlet jetties

Multibeam and topographic surveys with a 3D model of the structures, wave and current measurements, shallow seismics and numerical modeling to support the design of the jetty rehabilitation and channel dredging and rock removal.

Technical support for dredging works

Analysis of dredger accessibility to the dredging areas, assessment of the execution method and technical follow-up of the works at a port terminal.

Dynamic under-keel clearance (UKC) analysis

Calculation of the dynamic UKC of the access channel for each draught and speed, combining tide, waves, squat and ship response, in place of the static rule. The outcome is the feasible draughts and tidal windows for each condition, the gain in operability and the comparison between channel alignment alternatives, with the sedimentation predicted by morphodynamic modeling.

See our experience

Shall we talk about your project?

Tell us about your challenge and we will find the most suitable solution.

Get in touch